2123302303 Car Suspension Parts Tie Rod End For Mercedes-Benz
Type: | OEM Standard Size | Material: | NR-metal |
Size: | OEM Standard Size | Warranty: | 24 Months |
Color: | Black | MOQ: | 100 |
Delivery time: | 15~35 Days | Shipping term: | SEA or AIR |
Payment: | T/T | Packing: | Neutral Packing/Custmized Packing |
Function:The rack end ,or called axial joint is a steering component connecting the steering rack and the end of the tie rod. They transfer the axial force to the end of the tie rod and allow the wheels to turn.
How do you know when it's time to replace your rack end?A bad rack end can cause uneven tires, if it's really bad. It can even make a bad situation when you are driving. In addition to tire wear, a bad rack end will make a heavy feeling when you turn the steering wheel for the first time. It will also make a squeak when you use the steering wheel, so you must check it.
Here are some symptoms or warning signs to remind you that there may be a problem with the rack end.
The steering wheel is tight
Power steering fluid leakage
Grinding noise when turning
Fuel stains
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.