48520-3DN1A 48640-3DN1A Car Suspension Parts Tie Rod End For Nissan
Major Features:
• OEM & ODM Availability
• Years of cooperation with global top brand companies
• 100% performance test before delivery
• 8000+ part numbers
• Punctual delivery date & shorter lead time
• 95% positive customer testimonials from different countries
Description:
This Outer Tie Rod End is Applicable to NISSAN TIIDA Car Models from 2013~.
Includes C12, B17, as well as Nissan Versa Note 2012 ~ 2017. The Housing Material is SAE4140 / SAE4145 / S45C and the ball bin is made of SCM440 with heat treated at HRC 30 ± 3. The Oscillating torque is between 10 and 30 kgf.cm which is the same quality as OEM.
Specification:
The Housing Material is SAE4140 / SAE4145 / S45C, the ball bin is made of SCM440 with heat treated at HRC 30 ± 3, The Oscillating torque is between 10 and 30 kgf.cm which is the same quality as OEM
Launched Year
2015
Certifications
48520-3DN1A D8520-1KA0A D8520-4FJ0A 48520-4FJ0A D8520-3SG1A ES801168
Tie Rod End
Function:The tie rod end is part of the vehicle steering mechanism. It is one of the main pivots in the steering system to turn the wheels. Depending on the type of system, the mechanical box system can have either an inner tie rod or an outer tie rod, or only the outer tie rod end in the more popular rack and pinion system. In the rack and pinion transmission system, the tie rod end is the joint connecting the axial joint and the wheel, which transfers the force from the rack and pinion to the steering knuckle.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.