DG9Z3A130A Chinese suppliers Car Auto Suspension Parts Tie Rod End for Ford

Short Description:

OE NO.: DG9Z3A130A
DESCRIPTION: Tie Rod Ends
Car Fitment:  for FORD  -


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    Type: OEM Standard Size Material: NR-metal
    Size: OEM Standard Size Warranty: 24 Months
    Color: Black MOQ: 100
    Delivery time: 15~35 Days Shipping term: SEA or AIR
    Payment: T/T Packing: Neutral Packing/Custmized Packing

    Function:The rack end ,or called axial joint is a steering component connecting the steering rack and the end of the tie rod. They transfer the axial force to the end of the tie rod and allow the wheels to turn.
    How do you know when it's time to replace your rack endA bad rack end can cause uneven tires, if it's really bad. It can even make a bad situation when you are driving. In addition to tire wear, a bad rack end will make a heavy feeling when you turn the steering wheel for the first time. It will also make a squeak when you use the steering wheel, so you must check it.

    Here are some symptoms or warning signs to remind you that there may be a problem with the rack end.

    The steering wheel is tight
    Power steering fluid leakage
    Grinding noise when turning
    Fuel stains

    Competitive Advantages:

    Guarantee/Warranty
    Packaging
    Product Performance
    Prompt Delivery
    Quality Approvals
    Service
    Small Orders Accepted

    Warranty:

    Our warranty covers products shipped from us for duration of 24 Months.
    We will offer you a free replacement for the defective products in your future orders.
    This warranty does not cover failures due to:

    • Accident or collision.
    • Improper installation.
    • Misuse or abuse.
    • Consequential damages due to failure of other parts.
    • Parts used off-road or for racing purposes (unless explicitly stated)

    Packaging:                                

    1.Polybag
    2.Neutral box packing
    3.Topshine color box packing
    4.Customized box packing

    Picture Example:

    Delivery Time:

    1. 5-7days with stock 

    2. 25-35days mass production

    Shipping

    Picture Example (2)

    Picture Example (2)

    Picture Example (2)

    FAQ:

    Q1. Are you a Manufacture or Trading Company?
    A1:We are manufacturer and we also have licence to export auto parts.

    Q2. What is your MOQ?
    A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs

    Q3. How long is the production lead time?
    A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.

    Q4. What is your payment term?
    A4:Discussed!We accept payment by T/T, L/C, Western Union.

    Q5. What is your terms of packing?
    A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.


  • Previous:
  • Next:

  • Write your message here and send it to us