Factory supplied Machining Parts - 4013A092 4013A094 Car Suspension Parts Control Arm For Mitsubishi – Topshine
Factory supplied Machining Parts - 4013A092 4013A094 Car Suspension Parts Control Arm For Mitsubishi – Topshine Detail:
Type: | OEM Standard Size | Material: | NR-metal |
Size: | OEM Standard Size | Warranty: | 24 Months |
Color: | Black | MOQ: | 50 |
Delivery time: | 15~35 Days | Shipping term: | SEA or AIR |
Payment: | T/T | Packing: | Neutral Packing/Custmized Packing |
Function:The main task of all control arms is to fix the wheels to the frame. The control arm is also part of the safe steering control. This includes the following parts:
Lower control arm
Upper control arm
Rear control arm
Front control arm
Related hardware and fasteners
How do you know when it’s time to replace your control arms?When you are driving, the steering jitter is excessive, especially at high speed. When a control arm is connected to your frame and wheels, you will immediately feel the shaking, and the braking will also produce shaking.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.
Product detail pictures:
Related Product Guide:
Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for Factory supplied Machining Parts - 4013A092 4013A094 Car Suspension Parts Control Arm For Mitsubishi – Topshine , The product will supply to all over the world, such as: Zimbabwe, Jeddah, Hanover, Many years of work experience, we have now realized the importance of providing good quality products and solutions and the best before-sales and after-sales services. Most problems between suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question things they do not understand. We break down those barriers to ensure you get what you want to the level you expect, when you want it. faster delivery time and the product you want is our Criterion .
By Melissa from Lahore - 2017.12.02 14:11
Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
By Dolores from luzern - 2018.11.22 12:28