Factory supplied Machining Parts - 48068-12290 R 48069-12290 L Control arm for Toyota Corolla – Topshine
Factory supplied Machining Parts - 48068-12290 R 48069-12290 L Control arm for Toyota Corolla – Topshine Detail:
Type: | OEM Standard Size | Material: | NR-metal |
Size: | OEM Standard Size | Warranty: | 24 Months |
Color: | Black | MOQ: | 50 |
Delivery time: | 15~35 Days | Shipping term: | SEA or AIR |
Payment: | T/T | Packing: | Neutral Packing/Custmized Packing |
Function:The main task of all control arms is to fix the wheels to the frame. The control arm is also part of the safe steering control. This includes the following parts:
Lower control arm
Upper control arm
Rear control arm
Front control arm
Related hardware and fasteners
How do you know when it’s time to replace your air hose?When you are driving, the steering jitter is excessive, especially at high speed. When a control arm is connected to your frame and wheels, you will immediately feel the shaking, and the braking will also produce shaking.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.
Product detail pictures:
Related Product Guide:
It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Factory supplied Machining Parts - 48068-12290 R 48069-12290 L Control arm for Toyota Corolla – Topshine , The product will supply to all over the world, such as: Afghanistan, Azerbaijan, Latvia, Since always, we adhering to the "open and fair, share to get, the pursuit of excellence, and creation of value"values, adhere to the"integrity and efficient, trade-oriented, best way , best valve" business philosophy. Together with our all over the world have branches and partners to develop new business areas, maximum common values. We sincerely welcome and together we share in global resources, opening up new career together with the chapter.
By Odelette from Italy - 2017.05.02 11:33
This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
By Julie from Manchester - 2017.03.28 12:22