Manufacturing Companies for Pitman Arm - 45401-19095 K9120 Pitman Arm Steering Arm For Toyota Corol – Topshine
Manufacturing Companies for Pitman Arm - 45401-19095 K9120 Pitman Arm Steering Arm For Toyota Corol – Topshine Detail:
Type: | OEM Standard Size | Material: | NR-metal |
Size: | OEM Standard Size | Warranty: | 24 Months |
Color: | Black | MOQ: | 50 |
Delivery time: | 15~35 Days | Shipping term: | SEA or AIR |
Payment: | T/T | Packing: | Neutral Packing/Custmized Packing |
Function:The pitman arm is connected to the gearbox to control the direction of the vehicle by turning the wheels.
The car’s pitman arm needs routine maintenance and inspection to maintain the best condition. If your steering wheel is loose or excessive “clearance”, the vehicle will pull to one side.
How do you know when it’s time to replace your pitman arm?If the pitman arm is loose, you can see it moving around. Symptoms of a problem idler or pitman arm include lack of steering control, reduced steering response, rolling, vehicle tilting to one side, and uneven tire wear. It is dangerous when pitman arm or idler arm is not good.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.
Product detail pictures:
Related Product Guide:
We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for Manufacturing Companies for Pitman Arm - 45401-19095 K9120 Pitman Arm Steering Arm For Toyota Corol – Topshine , The product will supply to all over the world, such as: Bandung, Haiti, Stuttgart, You can let us know your idea to develop unique design for your own model to prevent too much similar parts in the market! We will provide our best service to satisfy all your needs! You should contact us right away!
By Klemen Hrovat from Uzbekistan - 2017.04.28 15:45
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Carey from Belgium - 2017.11.12 12:31