MOOG K6327 Suspension Control Arm Bushing Kit for Chevrolet C1500
K6327 Car Auto suspension systems Rubber Bushing For MOOG
Fits Select:
1999-2003 CHEVROLET SILVERADO
1988-2000 CHEVROLET GMT-400
1995-1999 CHEVROLET TAHOE
1999 GMC DENALI
1989-2000 GMC SIERRA
1997-2000,2002 CHEVROLET EXPRESS G3500
1992-1999 CHEVROLET SUBURBAN
2001 CHEVROLET EXPRESS CUTAWAY
1997-2002 CHEVROLET EXPRESS G1500
2000 CHEVROLET TAHOE 8 Cyl 5.7 L
1988 GMC GMT-400
1995-1998 GMC YUKON
1997-2002 CHEVROLET EXPRESS G2500
1996-2002 GMC SAVANA
1992-1999 GMC SUBURBAN
1996 CHEVROLET EXPRESS VAN
1996 GMC RALLY WAGON
1996 CHEVROLET G20
Bushing
Function:The rubber bushing reduces and isolates suspension noise and roughness, suppresses unwanted vibration, and resists wear, salt, road dirt and oil stains without transmitting it to the vehicle.
How do you know when it's time to replace your bushing?The bushing bears a huge load, which has an important impact on the handling performance of the vehicle. Therefore, the quality of the parts must be given priority and replaced in time if there is any damage.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.