Rear Absorber Mounting Right HYUNDAI MATRIX 1.6 L BETA I4 AUTO 2001 – 2010
Manufacturer Part Number | 55320-2D000 |
Part Description | Insulator-Rear Strut,RH |
Item Weight | 0.50 Pounds |
Position | Passenger Side |
Condition | New |
Fitment Type | Direct Replacement |
Manufacturer | Hyundai |
Vehicle Fitment
Year Make Model | Trim & Engine | Important vehicle option details |
---|---|---|
2000-2006 Hyundai Elantra | High Grade, Middle Grade | 4 Door Sedan, 5 Door Sedan |
2001-2008 Hyundai Tiburon | High Grade, Middle Grade|DOHC - MPI | 2 Door Coupe, Coupe - 2Door 4P |
Strut Mounts/Shock Absorber Mounts
Function:The shock absorber mounts support or strut support serves as the mounting point for the top of the vehicle strut assembly to connect with the vehicle chassis. It supports the vehicle weight, turns the shock absorber, and prevents vibration and noise from penetrating into the chassis. Strut mounts attach the suspension to the body to control vibration, ensure stability and make riding more comfortable.
Competitive Advantages:
Guarantee/Warranty
Packaging
Product Performance
Prompt Delivery
Quality Approvals
Service
Small Orders Accepted
Warranty:
Our warranty covers products shipped from us for duration of 24 Months.
We will offer you a free replacement for the defective products in your future orders.
This warranty does not cover failures due to:
• Accident or collision.
• Improper installation.
• Misuse or abuse.
• Consequential damages due to failure of other parts.
• Parts used off-road or for racing purposes (unless explicitly stated)
Packaging:
1.Polybag
2.Neutral box packing
3.Topshine color box packing
4.Customized box packing
Picture Example:
Delivery Time:
1. 5-7days with stock
2. 25-35days mass production
Shipping:
FAQ:
Q1. Are you a Manufacture or Trading Company?
A1:We are manufacturer and we also have licence to export auto parts.
Q2. What is your MOQ?
A2: We do not have MOQ . we accept lower quantity for your trial order . for the item we have in stock We can even supply you at 5pcs
Q3. How long is the production lead time?
A3:For some itesm we keep some stock that can be delived in 2 weeks New poductioin leadtime 30 days-60days.
Q4. What is your payment term?
A4:Discussed!We accept payment by T/T, L/C, Western Union.
Q5. What is your terms of packing?
A5:Generally,we pack in neutral polybag or boxes and then brown cartons.Also we can Do custom packaging as per your request.